Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T14DV09163

Parcel: 129020440


Addresses:

2800 E BROADWAY BL


Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T14DV09163

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
11/03/2014 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, MET WITH TFD WHO MENTIONED THEY DID NOT SEE THE BREAK BUT BELIEVE A WATER LINE BURST INSIDE THE CEILING DUE TO WATER DUMPING OUT OF THE CEILING AREA AFFECTING 5 DIFFERENT OFFICES. TFD TURNED SPRINKLER SYSTEM OFF AND ISOLATED POWER SO THAT THE WEST SIDE OF THE STRUCTURE STILL HAD POWER AND EAST SIDE WHERE THE LEAK OCCURRED HAD BEEN TURNED OFF.
** MET WITH MANNY MUNGUIA MAINTANENCE SUPERVISOR WHO STATED AFTER MEETING WITH FIRE, HAD CONTACTED PINNACLE WATER RESTORATION AND KAZAL FIRE SAFETY. BOTH COMPANIES ARRIVED WHILE ON SITE. MAX REPIN FROM PINNACLE STATED HE HAD PEOPLE IN ROUTE, MAY BE 30-45 MNUTES BUT UPON ARRIVAL WOULD HAVE THEM REMOVE FURNITURE FROM ALL 5 OFFICES, AND BEGIN EXTRACTING WATER FROM THE WALLS AND FLOORS. MAX CHECKED THE WATER CONTENT IN THE WALLS AND DID NOT FEEL THAT THEY WOULD HAVE TO REMOVE ANY DRYWALL. THEY WOULD REMOVE THE BASEBOARD AND EXTRACT WATER.
**KAZAL FIRE PROTECTION STATED THEY WOULD WAIT UNTIL THE OFFICE FURNITURE WAS MOVED AND WATER EXTRACTED BEFORE THEY BEGIN WORK. KAZAL WILL RESTORE FIRE SPRINKLER SYSTEM.
** MANNY STATED HE TOOK CARE OF ALL ELECTRICAL ISSUES FOR THE COMMERCIAL STRUCTURE AND WOULD REMOVE A COUPLE OF OUTLETS AND A SWITCH FROM EACH OFFICE TO DETERMINE IF WATER ENTERED ANY OF THE ELECTRICAL BUT WOULD MAKE SURE ALL ELECTRICAL WAS RESTORED BEFORE RESTORING POWER.
** CONTACTED MARTIN ROMERO INFORMED HIM POWER AND SRINKLER, HAD BEEN ADDRESSED AND WILL BE RESTORED BY APPROPRIATE COMPANIES, WATER WAS BEING EXTRACTED AND THAT ALL ISSUES HAD BEEN ADDRESSED AND WORK WAS IN PROGRESS. ASKED IF A NOV WOULD BE REQUIRED DUE TO ALL WORK WAS IN PROGRESS AT THE TIME OF MY ARRIVAL. MARTIN AGREED THAT A NOV WOULD NOT BE REQUIRED, I ALSO TOLD MARTIN I WOULD REINSPECT ONCE THE CEILING WAS OPENED BY KAZAL FIRE.