Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | WORK COMPLETED UNDER PERMITS. DDO FINALED ON 2/16 2017 ( T15SA00381, AND BUILDING PERMIT FINALED 7/07/2016 - T14CM07611. COMPLIANCE / CLOSE CASE. | |
| 04/26/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE TO OBSERVE THE ADDTIONS PUT ON THE PROPERTY. >CHECKED PERMIT PLUS AND FOUND THE DDO THAT HAD BEEN APPROVED. INFO ALSO IN RICHARD VIDALS REPORT. >FOUND PERMIT IN ISSUED STATUS (TI4CMO7716) AND SEE THAT RAY CAMACHO WAS LAST OUT ON 4/16/16 >ALSO SPOKE TO OWNER WHO STATED RAY HAD BEEN OUT RECENTLY BUTHAS MADE APPROX 3 INSPECTIONS BUT FOR HIM IT IS A MONEY ISSUE BUT WILL COMPLETE THE PROCESS. >PERMIT IN GOOD STANDING UNTIL 10/16/2016. |
|
| 04/08/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | Made contact with the owner and he has the survey completed and now has the drawings to submit for approval. Some of the changes have been completed on removing part of the overhang on the west side to not allow the water onto the property. Some of the construction has been removed due to the location of the structures. The owner hopes to have the drawings submitted by next week and hopes to be approved. Did go over that if the permit is issued that the inspection can be called in and if the finals are done to call me and the case can be closed. Will check in 45 days. RV. |