Case: T14DV02785

Parcel: 106120080

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T14DV02785

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
11/17/2014 INSP - FOLLOW UP CODE ENFORCE Approved At site, spoke to owner, all issues abated. Close case.
09/23/2014 INSP - FOLLOW UP CODE ENFORCE Approved At site, spoke to manager and tenant. Progress is slow because tenant won't allow manager to work on issues without her being there. The windows are installed and sheet metal for the roof is there but needs to be installed. F/U 30 days.
08/19/2014 INSP - FOLLOW UP CODE ENFORCE Approved At site, spoke to tenant. Progress is slow. There are multiple issue at this MHP. Called manager to explain that this needs to be completed within 30 days.
07/09/2014 INSP - FOLLOW UP CODE ENFORCE Approved At site, spoke to manager and tenant. Repairs are being made, door and some windows have been replaced. Ceiling fixed. Roof needs to be repaired. F/U 30 days.
06/16/2014 INSP - FOLLOW UP CODE ENFORCE Approved At site, spoke to manager and tenant. The materials are under the awing to repair the trailer. An agreement between the to is to have the repairs done on Tuesday affternoon. F/U 10 days.