Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T14DV00402
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/22/2014 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, FIRST MET WITH S/GAS WHO MENTION FIRE HAPPENED IN THE KITCHEN AREA, ONE LARGE STOVE, TWO SMALLER BURNERS, AND THE HOOD WERE ALL INVOLVED, EACH ONE HAD A GAS LINE TO IT AND BECAUSE THEY WERE DEALING WITH A COMMERCIAL BUILDING THEIR PLAN WAS TO TURN THE GAS OFF AND PIN THE METER WHICH THEY DID. TEP WAITED OUTSIDE, HAD BEEN CALLED TO THE SCENE BUT WERE NEVER INSTRUCTED WHAT TO DO. I CHECKED THE INTERIOR SUB PANEL, FUND NO BREAKERS HAD BEEN TRIPPED, AND ALLOWED TEP TO CLEAR THE SCENE. MET WITH TFD INVESTIGATORS, WHO INFORMED ME THAT THE WORKERS TOLD HIM THAT A PAN WAS LEFT ON THE INDUSTRIAL STOVE, THE RIGHT SIDE REAR BURNER ON A HIGH HEAT. THAT IS WHAT STARTED THE FIRE, AND FIRE SUPPRESION SYSTEM DID NOT GO OFF. HOOD WAS ALSO FIRE DAMAGED. ANCILLARY SYSTEM ALSO APPEARED FIRE DAMAGED. FIRE WAS CONTAINED TO THE SOVE AND HOOD AREA. WHEN ENTERING THE RESTARAUNT I ALSO FOUND WORK BEING DONE TO THE INSIDE OF THE RESTARAUNT. I ASKED THE OWNER OF THE STORE, MINTU IF HE HAD PLANS FOR THE CHANGES. HE SAID THAT THEY DO HAVE PLANS AND PERMITS FOR ALL THE WORK AND HAD AN EXISTING C/O. HIS RESTARAUNT HAS BEEN THERE APPROX 10 YRS. MINTU COULD NOT PROVIDE PERMITS. JANE, REPRESENTATIVE FOR THE OWNERS, MARSHALL FOUNDATION ALSO ARRIVED, MENTIONED SHE KNOWS THEY HAVE PERMITS, AND JANE MADE PLANS TO MEET WITH TAMARA OF PIMA COUNTY HEALTH AND GARRET OF G&J CONSTRUCTION WITH THE PLANS. MINTU DID PROVIE APPROVED FIRE INSPECTION FROM BRIAN COBB (TFD) DATED 1/16/2014. I SPOKE WITH MINTU, ASKED IF THE RESTARAUNT CONTINUED TO BE OPEN DURING CONSTRUCTION. HE MENTIONED ALL WORK WAS BEING DONE IN THE EAVINGS AND YES THE RESTARAUNT REMAINED OPEN. I INFORMED MINTU THAT BECAUSE OF THE UNFINISHED PERMITTED WORK AND NOW THE FIRE REPAIRS, THAT ALL WORK WOULD NEED TO BE COMPLETED PRIOR TO RE- OPENING THE RESTARAUNT. MADE ARRANGEMENTS TO MEET WITH CONTRACTOR AT 10 AM ON 1/20/2014. ** MET WITH GARRET CUNNINGHAM OF G&J CONSTRUCTION, AND GARRET PROVIDED (3) SETS OF PLANS FOR WORK BEING COMPLETED. DP 14-0008 DEVELOPMENT PLAN T13CMO7787 EXTERIOR FACADE: TO REMOVE AND PROVIDE NEW STORE FRONT T13CMO7609 INTERIOR CHANGES. GARRET MENTIONED HE WAS DEALING WITH STEVE SHIELDS AT DSD. MET WITH TAMARA OF THE PIMA COUNTY HEALTH DEPT, SHE EXPLAINED WHAT WAS REQUIRED OF THE OWNER AS FAR AS FOOD, FOOD TEMPS, ETC... WHICH HAD NOTHING TO DO WITH THE FIRE. MOST OF THE WORK TAMARA WAS CONCERNED WITH HAD BEEN ABATED. FOD WAS REMOVED AND AREA WAS BEING CLEANED BY THE WORKERS. A NOV WAS ISSUED FOR THE FIRE DAMAGED EQUIPMENT, THE HOOD, THE FIRE SUPPRESION SYSTEM. AND GAS LINES. |