Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/01/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
All inspections finalled , violation abated -CLOSE CASE |
| 09/10/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
No inspecton have been done. Did call the owner and will be calling an inspection in for extension. Still lacking a beam being changed to the correct size. Will check in 45 days. RV. |
| 06/06/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit has been issued, T13CM01675 on 5-2-14 with no inspection done. Will check in 90 days. RV. |
| 04/29/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Nothing has been done on the permit and still in applied status. Will charge the re-fee of $75.00 for the inspection. Will check in 30 days. RV. |
| 03/25/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The owner called and the plans have been approved on 3-22-14 and are lacking payment. The owner needs more time to pay for the permit to be issued. Will check in 30 days. RV. |