Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2015 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/20/2015 | FRAMING | Denied | 1. STRAP AND BLOCK ALL ABS HORIZANTAL PIPING EVERY 4'-0" WITH APPROVED METHOD 2. RANGE AND DRYER RUNS NEED TO BE SECURD WITHIN 6" OF BOX 3. FURNACE B-V4ENT IS TOUCHING ELECTRIC CABLE TO CONVIENCE LIGHT. 4. SHALL PRIVIDE ENGINEER RFI FOR OVER NOTCH TOP PLATE 2ND FLOOR WHERE B-VENT IS LOCATED. 5. SEAL PENETRATION @ NORTH WALL T&P DRAIN |
|
| 10/19/2015 | FRAMING | Denied | 1. SHALL PROVIDE BLOCKING ANS TRAP FOR ABS PIPING EVERY 4'-OO". P-TAP IS NOT APPROVBED MATERIAL. 2. SEAL ALL PENETRATIONS ON STUCCO MESH 3. WATER HEATER B-VENT NOT SECURED 4. FIRE STOP ALL PENETRATIOS THROUGH TOP PLATE 5. SEAL BOTTOM IST FLOOR PLATE 6. STRAP DOWN GAS LINE 7. INSPECTION STOPPED |