Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2015 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/12/2014 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 12/12/2014 | PLUMBING - GAS PRESSURE TEST | Denied | PROVIDE CITY APPROVED PLAN FOR NEW PIPING. COATED PIPE REQUIRED BELOW GRADE. JOINTS REQ PIPE WRAP & PIPE WRAP PRIMER. TEST W/ A 15 PSI GAUGE. EXTEND PIPING AT STOVE SO THAT GAS VALVE IS ACCESSIBLE. PROVIDE VALVE. REPLACE GAS FLEX AT NEW WATER HEATER. TYPE B-VENTING REQUIRED. TERMINATE T & P. CARBON MONOXIDE DETECTOR REQ. |