Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2015 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 06/03/2015 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
| 06/03/2015 | MECHANICAL - ABOVE CEILING | Not ready for Inspection | 1. PROVIDE MINIMUM 2" BEADED COLLARS AT ALL FLEX DUCT CONNECTIONS 2. SEE MECH DETAILS. DUCT LENGTH AND INSTALLATION NOT PER PLAN 3. CONDENSATE PIPING NOT INSTALLED |