Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2015 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 01/14/2015 | ELECTRIC - FINAL | Denied | GEC TO BE MADE UP IN AC DISCONNECT J BOXES ON EACH SOLAR ARRAY TO BE MADE UP ON ROOF LINE AND LOAD MAY BE ENEFRGIZED LABLE IN PANEL FOR SOLAR BREAKER AND INVERTER DC DISCONNECT MISSING |
|
| 01/09/2015 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/09/2015 | ELECTRIC - FINAL | Not ready for Inspection | NO INSPECTION |