Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T14CM07391
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2017 | ENGINEERING - FINAL | Approved | ||
09/01/2017 | ENGINEERING - FINAL | Not ready for Inspection | THIS SITE WILL BE SCHEDULED NEXT WEEK IF THE INFORMATION THAT HAS BEEN REQUESTED IS MADE AVAILABLE FOR THE INSPECTION. | |
08/22/2017 | ENGINEERING - FINAL | Not ready for Inspection | THIS SITE HAS NOT BEEN APPROVED DUE TO THE CHANGES THAT HAVE BEEN MADE TO THE DEVELOPMENT PACKAGE. REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THE SITE ARE REQUIRED ALONG WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THE SITE. | |
02/27/2017 | ENGINEERING - FINAL | Not ready for Inspection | NO ONE ON SITE WITH PLANS OR PERMITS. MUST COMPLET WORK ON DP PERMIT BEFOR ENGINEERING. |