Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T14CM07391
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2016 | ELECTRIC - FINAL | Approved | ||
06/15/2016 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
06/15/2016 | ELECTRIC - FINAL | Partial Approval | 1- ok for approval pending COT B.O. approval of engineers documents concerning seal off and related systems | |
05/19/2016 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
05/10/2016 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
04/19/2016 | ELECTRIC - FINAL | Partial Approval | #1. Verify EPO pushbuttons at the parking light poles are rated for class 1 Div 2 location. #2. Color code equipment grounds in handholes. #3.Ground all metalic underground handhole covers, (CNG) building areas (2). #4. Provide on site test for the service GFI protected main circuit breaker. #5. Plug all unused openings in conduit and enclosures. #6. Provide warning labels on service and associated equipment supplied by multiple power sources. ( EM Generator ). #7. Use approved supports for exposed ground conductors in the new CNG building. #8. Provide bond bushings at the CNG compressor conduit terminations. #9. Bond bushings at the parking lot light pole bases loose or not secured properly. #10. Repair the J-box cover at light pole on the 1st row ( damaged ). Ref: NEC, art. 110.3, 230, 250, 300, 500 thru 514, 700 thru 702. |