Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2015 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/12/2015 | PLUMBING - ROUGH, SOIL | Approved | OK TO BACKFILL GREASE INTERCEPTOR | |
| 02/06/2015 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 02/06/2015 | PLUMBING - ROUGH, SOIL | Partial Approval | INSIDE BUILDING APPROVED. SEPTIC TANK NEEDS INSPECTION. | |
| 02/06/2015 | PLUMBING - ROUGH, SOIL | Denied | IRC 905.4. EACH DRY VENT SHALL RISE VERTICALLY TO A POINT OF NOT LESS THAN 6" ABOVE FLOOD LEVEL OF FIXTURE. NOT INSTALLED PER PLAN (NOT UNDER TEST 1040 AM SHAWN). |