Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2014 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/20/2014 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 10/20/2014 | PLUMBING - ROUGH, SOIL | Partial Approval | TOILET RM OK @ MS A SANITARY MAY NOT BE IN STALLED HORIZONTALLY 1. A COMBO IS THE CORRECT DRAINAGE FITING 2. DRY VENT SHALL RISE VERTICAL TO 6" ABV FLOOD LEVEL OF FIXTURE 3. MS PIPING NOT UNDER TEST |
|
| 10/17/2014 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/17/2014 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | PROVIDE A 10' HEAD TEST INSTALL ABOVE SLAB TEST FITTINGS FOR TESTING NEXT SECTION CORRECT MOP SINK CONNECTION & TEST | |
| 10/15/2014 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/15/2014 | PLUMBING - ROUGH, SOIL | Denied | KEEP OPEN PIPES CAPPED FOR SAFTEY. IMPROPER USE OF DRAINAGE FITTINGS FURNCO NOT APPROVED FOR INSIDE BUILDING VENTING NOT PER PLAN, DOES NOT MEET CODE PILL NOT SIZED PER PLAN REDUCTION IN SIZE NOT ALLOWED |