Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2014 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/10/2014 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/05/2014 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/05/2014 | PLUMBING - ROUGH, SOIL | Denied | PROVIDE A VENT FOR INTERCEPTOR. VENT FLOOR SINKS DOWN STREAM OF P-TRAP. VENT SHALL RISE VERTICALLY TO 6" ABOVE FLOOD LEVEL PRIOR TO OFFSET (INSTALL INTERCEPTOR). NO HUB COUPLINGS ARE NOT FOR PLASTIC USE SOLVENT CEMENT COUPLINGS. NO PLUMBERS TAPE, USE APPROVED STRAP. |