Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2016 | FIRE - FINAL | Approved | ||
| 11/17/2016 | FIRE - FINAL | Partial Approval | TCO approved. Need to check power to panic hardware. Confirm alarm operation of delayed egress. | |
| 10/25/2016 | FIRE - FINAL | Denied | Fire sprinkler contractor need to install the 4 new heads Fire alarm contractor working without a permit and or approved plans. Need to submit fire alarm drawings and submittal to the COT for plan review. Need to adjust the height of the horn strobe/ strobes to 80" at bottom of lens. Provide documentation showing 100 % pre-test along with print out from central station verifying the signals prior to next fire final Tested the emergency and exit lights, verified the generator back up. Fire extinguisher placement is approved. |
|
| 10/11/2016 | FIRE - FINAL | Not ready for Inspection | Called in Fire Alarm Final because he didn't know how to get an inspector out for an 'intermediate' inspection ( because there is no option on his card). Had questions about exit sign placement, Address, and knox box locations. Answered questions. Alarm system is being installed, but not ready for inspection. |