Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2014 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/28/2014 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/28/2014 | ELECTRIC - FINAL | Denied | 1. 36" CLEARANCE REQUIRED IN FRONT OF SES 110.26 NEC 2. VERIFY GROUNDING ELECTRODE SYSTEM INTACT 250-NEC 3. BONDING BETWEEN RACEWAY & ENCLOSURE IMPAIRED BY RE WASHERS AND USE OF CHASE NIPPLE, USE CLOSE NIPPLE AND BOND BUSHINGS AT CONDUIT TERMINATIONS TO ENSURE A RELIABLE MECHANICAL CONNECTION AND BOND 250 NEC 4. SUPPORT CONDUITS TO STRUCTURE PER CODE. NOTE:UNITS ENERGIZED PRIOR TO INSPECTORS APPROVAL |