Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2014 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 08/26/2014 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/26/2014 | PLUMBING - GAS PRESSURE TEST | Denied | BOTH WHS; CORRECT WH VENTING, SECURE LACH JOINT EXTEND TERMINATION ABOVE COOLER CONNECT RELIEF DRAIN CHECK SAFTEY RELIF VALVES FOR PROPER OPERATION INSTALL CO DETECTOR FLASHING AT PENETRATION PROVIDE ELECTRICAL BONDING OF GAS LINE SUPPORT PIPE, PROVIDE PLAN CHECK SIZING |