Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2015 | FRAMING | Approved | IVRS - Inspection :* | |
| 02/24/2015 | FRAMING | Approved | LEFT MESSAGE @ 10:45 AM | |
| 02/19/2015 | FRAMING | Partial Approval | IVRS - Inspection :* | |
| 02/19/2015 | FRAMING | Partial Approval | 1. FIRE BLOCK DROPPED CEILING @ CLOSET 2. OVER FRAME PER DETAIL 4/3 @ VALLEY (?) FRAMING NOT PER PLAN. MISSING 2X4 SLEEPER ON EDGE 3. EXCEPT BREAKTHROUGH MASONRY 4. BOND GASLINE |
|
| 01/15/2015 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 01/15/2015 | FRAMING | Not ready for Inspection | 1. H2.5 REQUIRED AT TRUSS TO PLATE CONNECTIONS ALL NAIL HOLES ARE TO BE USED 2. PROVIDE EXTENSION LADDER TO ACCESS ROOF 3 PLATE AT BATHROOM WALL NOT PROPERLY ATTACHED 4 ALL INTERMEDIATES TO BE APPROVED PRIOR TO FRAMING 5TRUSS CALCS TO BE ON SITE |