Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T14CM03839
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/15/2015 | FIRE - FINAL | Approved | ||
06/10/2015 | FIRE - FINAL | Not ready for Inspection | SPOKE WITH RICK, THE GENERAL CONTRACTOR. ALARM SYSTEM INSTALLED CORRECTLY, BUT TMC MONITORING PANEL IS NOT RESETTING CORECTLY AFTER ALARMS AND TROUBLES. | |
06/09/2015 | FIRE - FINAL | Not ready for Inspection | NOT READY... ALARM SYSTEM STILL NOT COMMUNICATING WITH PANEL CORRECTLY. | |
06/05/2015 | FIRE - FINAL | Not ready for Inspection | NORM CALLED AND STATED THAT THE PANEL IS STILL MISCOMUNICATING WITH THE PANEL AT TMC AND THAT THEY WERE NOT YET READY FOR INSPECTION. AS BUILDS ARE STAMPED AND ON SITE, PER NORM. |
|
06/04/2015 | FIRE - FINAL | Partial Approval | 1. Must submit as builds. 2. Must fix alarm issues with how the duct detectors are reporting to the proprietary monitor at TMC. Half reported as alarm and half as trouble. Should be supervisory. 3. Also, the pull station sounded a local alarm that reported to the panel on site, but was not received at TMC's panel. What Passed - All duct detectors were set off by smoke. Both the Lobby Main and the IOP entrance doors auto unlocked when the pull station was pulled. |
|
06/03/2015 | FIRE - FINAL | Not ready for Inspection |