Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2014 | FIRE - FINAL | Approved | ||
| 09/08/2014 | FIRE - FINAL | Denied | 1. Rear exit door and 1hr fire rated corridor not installed as per approved plans on Pg. AO.2, need to have approved plans changed showing no corridor needed. 2. IFC 3304.2 Combustible debris shall not be accumulated within buildings, shall remove all trash and construction debris out of the building in the rear part of the building. 3. Address number posted on building 12" size |