Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2014 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 07/10/2014 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/10/2014 | BUILDING - FINAL | Denied | BOTH ARRAYS OF PANEL ON ROOF ARE STILL LOOSE REFEE WILL BE POSTED | |
| 07/03/2014 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 06/09/2014 | BUILDING - FINAL | Denied | 1. REPLACE UNLISTED CONDUITS OUT OF BOTTOM OF PANEL ALL THE WAY TO WHATEVER THEY ARE SEVICING. DO NOT BACK FILL NEW CONDUIT TRENCHES WITHOUT INSPECTION. 2. INSTALL 2 DRIVEN ROD GROUNDING SYSTEM AND GAS + WATER BONDS 3. INSTALL ANTI-OXIDENT ON A1 WIRES 4. PROVIDE ACESS TO CONDUIT RUNS 5. HAVE PERMIT ON SITE 6. IDENTIFY ALL BREAKERS 7.INSTALL ADDRESS ON PANEL |