Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2016 | FIRE - ALARM FINAL | Approved | ||
| 04/23/2015 | FIRE - ALARM FINAL | Partial Approval | PHASE #1 partial approval The following was completed and passed for Phase #1: 1. Duct smokes 2. Smoke above NAC panel 3. Pull stations 4. Horns and strobes 5. Dated batteries in NAC 6. NAC electrical panel labeled The following will need to be done before phase #2 final will be given: 1. Need lock out installed on breaker for the alarm NAC 2. Need lock out installed on breaker for the fire Bell |