Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 03/10/2015 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Underground is going to be installed in 2 parts due to not having open tranches; First part inspected 4" CPVC from riser base to the sidewalk, all mag lugs in place and wrapped with plastic and all tracer wiring in place depth is over 36". OKAY to bury but still needs 200 PSI for 2 hours and flush. |