Permit: T14CM01799

Parcel: 10504018C


Addresses:

25 E RIVER RD

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
05/08/2014 PLUMBING - ROUGH, SOIL Approved
05/07/2014 PLUMBING - ROUGH, SOIL Partial Approval
04/30/2014 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
04/30/2014 PLUMBING - ROUGH, SOIL Denied USE REQUIRED FASTENERS ON METAL CLIPS. REMOVE ALL ROCKS FROM AROUND PIPING. CORRECT CONN TO EXISTING SEWER. REMOVE PVC. PROVIDE A TEST ON SEWER, INSTALL TRACER WIRE. REMOVE BACKWATER VALVE. EACH DRY VENT SHALL RISE VERTICALLY ABOVE FLOOD LEVEL PRIOR TO HORIZ OFFSET. SUPPORT VENTS IN WALLS & ABOVE CEILING.