Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T14CM01766
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/24/2014 | FIRE - FINAL | Approved | 1st inspection at 9:30 AM theater 4 and 6 emergency lighting failed after 5 minutes of operations after leaving emergency lights on for 1 hours all theaters passed but # 4 and 6. Emergency lighting failed over front lobby doors batteries not plugged in Found two painted or taped heads in theater #3 along both walls. 2nd inspection at 3:30 PM new batteries installed for theaters # 4 & 6 this time they work for 1 hour and the front lobby worked also. Tape on sprinkler heads removed. |
|
09/17/2014 | FIRE - FINAL | Partial Approval | TEMP C OF O OKAY FOR TRAINING ONLY NO PUBLIC OR SALES To get finals the following shall be done: Same as last inspection on 09.16.2014 Need to repair or replace inspector test valve Lock outs on breakers to FACP and Booster panel Repair or replace flow switch |
|
09/16/2014 | FIRE - FINAL | Denied | Theater # 1 Painted head in the center of theater possible painted or dirty heads in other areas By screen sprinkler heads block by screen not allowing for the head to properly form its spray pattern need to correct sprinkler coverage Theater #2 By screen sprinkler heads block by screen not allowing for the head to properly form its spray pattern need to correct sprinkler coverage 4 sprinkler heads on eastside of room have taped sprinkler heads Theater #3 By screen sprinkler heads block by screen not allowing for the sprinkler heads to properly form its spray pattern need to correct sprinkler coverage Theater #4 By screen sprinkler heads block by screen not allowing for the sprinkler head to properly form its spray pattern need to correct sprinkler coverage Stairwell to projector room sprinkler head on ground floor head painted Theater #5 By screen sprinkler heads block by screen not allowing for the sprinkler head to properly form its spray pattern need to correct sprinkler coverage Theater #6 By screen sprinkler heads block by screen not allowing for the sprinkler head to properly form its spray pattern need to correct sprinkler coverage While inspecting the sprinkler coverage I notice over 30 sprinkler heads with blue paint spray on them therefore you are order to have a completely inspect all fire sprinkler heads for paint if they are painted you will need to change them. Will need to replace all missing escutcheons on all sprinkler heads Need to have alarm sub to call in there final Need to have Hood sub call in there final Need to have sprinkler call in there final again |
|
09/04/2014 | FIRE - FINAL | Denied | Need to add EM lighting over steps to rear exits in each movie theater, EM lighting to all aisles to egress ways. |