Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T14CM01316
Inspection Description - FIRE - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2014 | FIRE - FINAL | Approved | ||
| 07/14/2014 | FIRE - FINAL | Denied | 1. Need to add duct detectors to alarm system. 2. Need to add all smoke/fire dampers to alarm system 3. Need to fire caulk all boxes for strobes/horns, eletrical outlet boxes, switch boxes, communication's boxes and holes in walls that are located in the fire rated corridor. 4. Needs as built bubble areas where changings were made on plans and show a new matrix schedule on plans. 5. Check all fire/smoke dampers for proper caulking fond holes through walls. 6. If installing access-controlled devices on egress doors on 1st and 2nd floor from the lobbies to the 2nd exits on each floor, than both door devices will need to be added on the alarm system so that in alarm condition all egress doors with access-controlled device are by-pass and anybody can open the doors without any special knowledge or effort. IFC 1008.1.9.8 |
|
| 07/10/2014 | FIRE - FINAL | Denied | Need fire alarm final before fire final will be given Per Ken Brouillete (Fire Code Administrator) plans stamped for the addition of a fire rated wall for the conference room wall only to maintain fire corridor rating continuity. On 2nd floor according to Mr. Brouillete no fire rating needed. |
|
| 07/01/2014 | FIRE - FINAL | Denied | 1. Per IFC & IBC 1018.6 corridor continuity, 1st floor not correct need fire rated walls all the way to the exit in the lobby. Also questioning the possible rating for the 2nd floor corridor. 2. Stairs on southwest corner (1st floor) has a storage room under it Per section IFC & IBC 1009.9.3 & 1009.9.4 Enclosures under interior stairways, shall be 1 hour fire-resistance-rated construction. 3. Need to install FD key box system per stamp on cover page of approved plans. |