Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ENGINEERING - FINAL
Permit Number - T14CM01031
Inspection Description - ENGINEERING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2014 | ENGINEERING - FINAL | Not ready for Inspection | 1) NOT READY, CALL FOR RE-INSPECTION WHEN CONSTRUCTION IS COMPLETE 2) ENSURE PHASE TWO CONSTRUCTION IS SEPARATED FROM OCCUPIED BLDG |
|
07/31/2014 | ENGINEERING - FINAL | Approved | SEPERATE BUILD FORUM PHASE 2 |