Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2014 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 10/01/2014 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 10/01/2014 | PLUMBING - INTERMEDIATE | Not ready for Inspection | OK- PROVIDE TEST. WRAP PIPES FOR CONCRETE | |
| 09/02/2014 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/29/2014 | PLUMBING - INTERMEDIATE | Denied | PROVIDE DRAINAGE FITTINGS installed as required. VENT 90 DEGREE NOT ALLOWED FOR DRAINAGE SANT T. VENT TRUSS CALCS FOR MECHANICAL UNIT AND INSTRUCTIONS FOR HANGING UNIT. SECURE VENT WITH SCREWS. CORRECT INSULATION COMPLETE NOTED CORRECTIONS TEST ALL JOINTS METAL RACEWAY FOR FUTURE SOLAR PROVIDE CITY APPROVED PLANS |
|
| 08/21/2014 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/21/2014 | PLUMBING - INTERMEDIATE | Denied | PROVIDE GUY WIRES FOR ELECTRIC SERVICE. UFER REQS ACCESS. FUTURE SOLAR - TRUSS NOT DESIGNED TO SUPPORT MECH HOUSE BIB VACUUM BREAKER. YARD LINE (TEMP CONN) 12" COVER REQUIRED. DWV REQUIRES PROPER USE OF DRAINAGE FITTINGS. POINT OF VENT MAY NOT BE BELOW TRAP WELD. TEST ALL SYSTEMS, FITTINGS, FIXTURES. PROVIDE A SOLVENT WELD WASTE AND OVERFLOW KIT FOR TUB. IT IS NOT ADVISED TO OFFSET TUB TAIL PIECE. NO PIPING MAY BE EMBEDDED IN CONCRETE. PROVIDE MIN 18 OF COPPER AT WH PEX CONN. 4" SAFETY PLATES REQ AT PLUMBING & MECHANICAL. PVC REQ PRIMER. INSTALL PROPER SUPPORTS. SINGLE WALL VENT REQ 6" CIR. INSPECTION STOPPED |