Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2014 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 03/19/2014 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 03/19/2014 | PLUMBING - ROUGH, SOIL | Partial Approval | 1. ADDRESS TO BE POSTED PRIOR TO NEXT INSPECTION 2. PLUMBING ROUGH PIPED PER PLAN AND INSTALLED CORRECTLY. PLUMBING ROUGH IS ABS SCHEDULE 40, PLANS REFLECT OTHERWISE. PROVIDE ENGINEER APPROVAL FOR SCHEDULE 40 THROUGHOUT |