Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2014 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 03/31/2014 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/31/2014 | ELECTRIC - FINAL | Denied | CABLE OUTER COVERING MUST BE AT LEAST 1/4" INSIDE PANEL ENCLOSURE. SEAL PENETRATIONS IN BACK WITH NON-COMBUSTIBLE SEALANT. | |
| 03/31/2014 | ELECTRIC - FINAL | Denied | GROUNDING SYSTEMS, BOTH SERVICES TO BE COMMON. CIRCUIT BREAKER FOR H20 HEATER SHOULD BE 30 AMP | |
| 03/27/2014 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/13/2014 | ELECTRIC - FINAL | Denied | -NO GROUNDING SYSTEM OVER SIZED CKT BREAKERS FOR WIRING OF BRANCH CIRCUITS - UPGRADE TO 200 AMPS OR 100 AMPS MUST INCLUDE -COMPLETE SYSTEM METER RISER WIRING -SUPPORT CONDUITS PER CODE -RISER WEATHER HEAD TO LOW SERVICE CONDUCTORS LAYING ON ROOF PROVIDE ADDRESS LABELS USE A LICENSED ELECTRICIAN TO DO WORK - MUST HAVE BUSHINGS TO PROTECT WIRING INTO ENCLOSURE CABLES TO BE TERMINATED WITH APPROVED CONNECTORS AND 1/4" OF CABLE SHEATH INTO ENCLOSURE |
|
| 01/10/2014 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |