Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T14CM00036
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2014 | ENGINEERING - FINAL | Approved | LANDSCAPING FOR THIS SITE WILL BE COMPLETED UNDER THE DEVELOPMENT PACKAGE AS NOTED ON THE APPROVED PLANS | |
07/25/2014 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR CUSTOMERS AT THIS TIME. 1) FINAL WILL NOT BE GIVEN TILL AS-BUILT DRAWINGS AND CERTIFICATION LETTERS ARE TURNED IN FOR THIS SITE. 2) COMPLETE SITE AS SHOWN ON THE APPROVED PLANS. PROVIDE APPROVED REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD NOTING THAT ALL THE CHANGES APPROVED BY THE CITY OF TUCSON. | |
07/23/2014 | ENGINEERING - FINAL | Not ready for Inspection | ||
07/22/2014 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O FOR STOCKIONG ONLY. | |
07/18/2014 | ENGINEERING - FINAL | Not ready for Inspection | ||
07/17/2014 | ENGINEERING - FINAL | Not ready for Inspection | ||
07/16/2014 | ENGINEERING - FINAL | Not ready for Inspection | COMPLET INSTALL PER APPROVED PLANS OF ALL WORK. PROVIDE APPROVED CHANGES AS-BUILTS . WALKED SITE WITH GC AND DAVE ROBERTS. AND HIGH LIGHTS ON RED LINE. |