Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2016 | FIRE SPKLR - FINAL | Approved | ||
| 04/23/2015 | FIRE SPKLR - FINAL | Partial Approval | This job is broken up into 2 phases: Phase 1 is the kitchen area storage room and outside Restrooms Partial Approval given - OKAY to use the kitchen -Phase #1 approved To get final the following needs to be completed PHASE #2 and correct the list below: 1. Need to correct sprinkler coverage in the outside storage room sprinkler by water heater to far off wall 8' 6". 2. Need to correct sprinkler coverage in the outside storage room head spray pattern blocked by light. |
|
| 04/20/2015 | FIRE SPKLR - FINAL | Partial Approval | 1. Fire bell rings all the tIme wired wrong 2. Sprinkler wrench missing 3. Outside storage room correct head to far off wall 8' 9" - by the water heater 4. Need riser room sign on riser door 5. Need FDC sign over the FDC 6" red letters white background |