Inspection Status: Approved
Inspection History: POOL/SPA FINAL/BARRIER
| Date |
Description |
Inspector |
Results |
Comments |
| 10/03/2014 |
POOL/SPA FINAL/BARRIER |
|
Approved |
IVRS - Inspection :* |
| 09/05/2014 |
POOL/SPA FINAL/BARRIER |
|
Partial Approval |
IVRS - Inspection :* |
| 09/05/2014 |
POOL/SPA FINAL/BARRIER |
|
Partial Approval |
2012 IRC REQUIRES THAT ALL BACKFLOW ASSEMBLIES BE TESTED AT TIME OF INSTALLATION. 2503.8.2 ALL PIPING SUBJECT TO FREEZING SHALL BE PROTECTED. 2605.3. REMOVE METAL CLAMP FROM TOUCHING COPPER. 2605.1 |
| 08/26/2014 |
POOL/SPA FINAL/BARRIER |
|
Partial Approval |
IVRS - Inspection :* |
| 08/26/2014 |
POOL/SPA FINAL/BARRIER |
|
Partial Approval |
OK TO FILL POOL PROVIDE ALARMS LISTED UL2017 COUBLE GATE OK PER DQUINN BACK FLOW ASSEMBLY REQUIRES TEST & FREEZE PROTECTION |