Permit: T14BU00863

Parcel: 13817047B


Addresses:

301 E LOS REALES RD

Inspection Status: Approved

Inspection History: FIRE SPKLR - OH PIPING & HYDRO

Date Description Inspector Results Comments
11/16/2015 FIRE SPKLR - OH PIPING & HYDRO Approved
08/17/2015 FIRE SPKLR - OH PIPING & HYDRO Partial Approval All piping for placement done still needs to Hydro at 200 PSI for hours.
- Changed from AP to PA to allow for reinspection per Ken B.
08/03/2015 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Only looked at overhead piping and placement for areas marked on approved plans no pressure test was done.
06/12/2015 FIRE SPKLR - OH PIPING & HYDRO Partial Approval Only looked at overhead /courtesty inspection of what will be enclosed in hard deck where band/choir and pulpit area are.
There were two heads added in an alcove behind pulpit in hydro calced area. Must resubmit drawings for approval.
Asbuilds must reflect changes to riser ( 2 90 degree angles added before the main rise)
must reflect the change in the 1 1/4 inch pipe that now comes off lower branch to supply band storage room.
reflect any 90's to avoid duct work .