Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2014 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | 200 psi for 2 hours approved still needs to be flushed |
|
| 05/06/2014 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Looked at piping in trench for placement, wire tracer and plastic wrapping of all piping joints APPROVED. Still needs to be pressure tested at 200 psi for 2 hours and flushed. |