Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - ENGR - Sign Electrical |
|
Not Ready |
|
| 10/17/2013 |
COT - ENGR - Sign Electrical |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - ALL ELCTRICAL APPEARS TO BE OK AT THIS TIME EXCEPT FOR THE FOLLOWING: 1) LOCK OUT SWITCHES HAVE NOT BEEN NOTED ON THE SIGNS 2) THE NEON SIGN LOCATED AT THE SOUTHWEST CORNER OF THIS SITE. THIS WILL NEED TO BE RE-INSPECTED AT A LATER DATE BY ONE OF OUR ELECTRICAL INSPECTORS, CALL FOR A RE-INSPECTION OF THIS SIGN ON YOUR NEXT VISIT. |
| 07/29/2013 |
COT - ENGR - Sign Electrical |
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - I CONTACTED THE CONTRACTOR AFTER 9:00, THEY ARE NOT ONSITE AT THIS TIME AND WILL NOT ARRIVE IN TUCSON TILL BETWEEN 11:00 AND 12:00, I WILL STOP BY THE SITE AFTER 12:00.
THE CONTRACTOR IS STILL WORKING ON THE INSTALLATION OF EQUIPMENT AT THIS TIME 12:30PM, THESE INSPECTIONS WILL NEED TO BE RESCHEDULED AT A LATER DATE. HAVE ADVISED THE CREW THAT IF THEY HAVE COMPLETED ALL THE WORK NEEDED PRIOR TO 3 PM THIS AFTERNOON THEY CAN CONTACT ME AT 349-7643 AND I WILL COME BY FOR ANOTHER INSECTION. I LEFT THEM MY BUSINESS CARD AND PHONE NUMBER, NO CALLS BEFORE 3. SOME OF THE SIGNS WILL NOT BE COMPLETED AND I HAVE BEEN ADVISED THAT THEY MAY BE PLACED UNDER A NEW PERMIT NUMBER FOR THIS SITE. 3:00PM CURRENTLY THEY ARE WORKING ON THE LETTERING FOR THE WALL SIGNS.
I DROVE BACK THROUGH THE SITE AT 3 CREWS STILL WORKING IN THE SAME AREAS AS NOTED EARLIER. |