Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2013 | SIGN SITE REVIEW | Approved | ||
| 02/11/2013 | SIGN SITE REVIEW | Approved | SITE WALK WITH SIGN MANUFACTURER. SOME SIGN POSITIONS SLIGHTLY ALTERED FOR INCREASED DRIVER VISIBILITY AROUND SIGNS. | |
| 02/08/2013 | SIGN SITE REVIEW | Partial Approval | Sign area and height approved per variance S-00-05. Sign site setback and Sight visbility triangle check to occur week of 2/11/13 with contractor. |