Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T13DV09145
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | 04/11/14 - ARRIVED ON SITE WITH OWNERS SISTER AND CONTRACTOR AGAIN // BATH ROOM TEXTURED AND PAINTED // HALLWAY TEXTURE & PAINTED // SMOKE DECTORS UP IN HALL WALL AND TWO IN BEDROOMS // JUNCTION BOX IN BEDROOM WITH COVER // WILL MOVE TO CLOSE OUT THIS CASE // AV | |
| 04/10/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | 04/10/14 - ARRIVED ON SITE MET WITH CONTRACTOR AND OWNERS SISTER ON // NEED TO FINISH PAINT ON TEXTURE // COVER ON JUCTION BOX IN CLOSET IN BEDROOM AND FINISH INSTALL ON SMOKE DECTORS // ROOF TO SIDE PORCH REDONE -ABATED // WILL F/U ON FRIDAY 04/11/14 // AV | |
| 04/03/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | 04/03/14 - ARRIVED ON SITE NO ONE THERE // CALLED CONTRACTOR STILL WORKING ON IT BUT NOT THERE TODAY // UNIT NOW IS VACANT TENANT MOVED OUT // OWNER SISTER CALLED TO SET MEETING FOR THURSDAY 04/10/14 - 9:00 AM // AV | |
| 03/04/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | 03/04/14 - ON SITE MET WITH TENAT // SHOWED ME INTO HALLWAY // SMOKE DETECTOR ADDED // SHEETROCK UP ON WALL AND CEILING IN HALLWAY - NEEDS TEXTURE & PAINT // BATHROOM WITH FLOOR & REAR PANEL DONE TO VANITY -JUST NEEDS PAINT // OUTSIDE PORCH AREA LEAKED AGAIN THIS WEEKEND (RAIN) // CALLED CONTRACTOR WILL BE AT PROPERTY THIS WEEK NEEDS ABOUT 10 MORE DAYS TO COMPLETE // WILL F/U IN 15 DAYS // AV | |
| 02/10/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | 02/10/14 - ARRIVED ON SITE MET WITH TENANT & CONTRACTOR WORKING FOR OWNER // ELECTRICAL IN STORAGE ROOM COMPLETE DOUBLE LUGGING REMOVED AND ADDED ROMEX WAS REMOVED // ALL DONE ELECTRICIAN WORKING WITH CONTRACTOR // WORKING ON HALLWAY THEN BATHROOM THEN FINALLY ROOF REPAIR // CONTRACTOR WILL BE DONE IN 15 DAYS WILL F/U ON 02/25/14 - NO REINSPECTION FEE AT THIS TIME MOVING TOWARDS COMPLIANCE // AV | |
| 12/23/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE: MET WITH OCCUPANT WHO SHOWED WHERE PLACED BUCKETS AND BUBBLES IN PAINT FROM RAIN LEAKING INTO DWELLING. ROOF EAVES SHOW DETERIOREATION FROM WATER DAMAGE. FURNANCE ROOM SHOWS SUB-PANEL DOUBLED LUGGED. ADDED ROMEX, GROUND NOT CONNECTED. NEW FURNANCE, CARRIER. |