Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T13DV08890
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | This case is with the city prosecutor MJ Raciti awaiting the appeals process. The owner has made several appeals to the citation and counts against him for the work he did without permits. MJ contacted me on 07-25-17 to verify the owners name and stated the case is still open. | |
05/04/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | Visited the site and took pictures for court. Upon arrival the Hedrick gate and the Cherry gate were open. As I approached the area by the Cherry gate one of his employees ran over and closed and locked the gate. He the proceeded to the Hedrick gate and did the same. Evidence shows that there is work still in progress after the posted Stop Work Order. A new wall around the perimeter has been erected. | |
04/20/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | Visited the site and there is work being done. A foundation trench is in progress for a permiter wall. Stop work order is still in affect. | |
03/18/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | Visted the site and no work in progress. No permits have been obtained. | |
02/10/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE: STUCCO WORK IN PROGRESS. NO PERMITS HAVE BEEN OBTAINED. | |
12/31/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Visted the site and no work in progress. No permits have been obtained. | |
11/28/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Visited the site with Inspector Navarro. Pictures were taken. We determined that work was being done with out permits. The structuial work installed is not code compliant. There is a temp service installed on unit #6. A permit for a service upgrade was obtained for #8, but no work done. There has been new blockwalls and infill done on the interior. A "Stop Work Order" was posted on site. I called the number given to me by the employees and left a message. Research shows this property changed hand in Febuary of 2014. | |
11/25/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE: WALKED COMPLETE PROPERTY, INTERIORS, EXTERIOR, BASEMENTS/CELLERS. ROOFS. MORE VISIBLE SIGNS OF ADOBE DETERIORATION, CRACKING, SEPERATING, SIGNS OF ROOF LEAKS IN UNITS. APPEARS TO HAVE 5 OCCUPIED UNITS, ALLOWED TO ENTER 2 WITH CONFIRMATION OF OCCUPANTS. MANAGER WORKING ON OTHERS. 2 ENTERED SHOWS ISSUES. MAIN ISSUE NO PERMANENT SOURCE OF HEAT. UTILIZING SPACE HEATERS FOR HEAT. UNIT 3: FRONT DOOR LACKS WEATHER STRIPPING. WINDOWS DO NOT SEAL PROPERLY. NO SMOKE DET. NO HEAT ELECTRIC HSOWS OPEN GROUND UNDER TEST. ADDED BATH NO RECEPTICALES NO MECHANICAL EXHAUST, NO WINDOW, NO VENTILATION. APPEARS 2 ROOMS TURNED INTO 1. WALLS MOVED, ADDED. UNIT 2-B: FRONT DOOR WEATHER STRIPPING. FRONT DOOR FRAME SEPERATED FROM WALL. LONG HALLWAY NOW ENTRY TO UNIT. BEHIND FRONT DOOR 3' OPENING TO 6' WALL WITH OPENING INTO UNIT AT BOTH ENDS OF WALL (?) ADOBE BUCKLING INWARD AT FLOOR IN 3' SPACE BETWEEN ENTRY DOOR AND UNIT OPENINGS. LIVINGROOM CEILING SHOWS LEAKS, CRACKS, SEPERATION. UTILIZING TOASTER OVEN FOR HEAT. NO HEAT. NO SMOKE DET. ADDED BATH, WATER LINES, ELECTRIC. WALLS ADDED, REMOVED. APPEARS 2 ROOMS CHANGED INTO 1. |