| 09/03/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Meet Electrician on site and witnessed items are completed. Informed Dan Quinn of compleation. Close case. |
| 08/08/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Meet with owner to verify work done. The electrician has not completed his work. The owner will contact him. |
| 07/30/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
visited site, inspected, found wall built,will research |
| 06/19/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Spoke with the owner and he will have the electrician call me later. |
| 06/19/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Spoke with the electrician and he is starting Friday. I will check on this later. |
| 06/17/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Visited site and tried to contact Mr Writz's son who was to be incharge. Left messages. Have not heard any updates. |
| 05/29/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Meet with PDSD inspector, Owner and tenant. Determined that items 1,2,3,5,6,7,&9 need to be completed. Owner will call me when done for inspection. |
| 05/21/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Meet with building owner and discussed what needed to be done. He will contact his electrician to finish the work stated in the NOV and complete the permit. I will work with him on time frames. He is going to remove the sign on the other building and paint over the one on his building. |
| 04/11/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Meet with Dave Roberts (PDSD) and Tenant to discuss illegal signs. The A-frame, the dancing man on the roof, and wall sign on neighbors building. |
| 03/04/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Visited site to view NOV violations. Items on NOV have not been abated. |
| 02/24/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Researched Permits Plus and the permit for the wall is finaled. The electrical permit has failed an inspection on 2-14-14. |
| 02/04/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Researched Permits Plus and the permit for the wall was obtained on 01-23-2014. No inspections at this time. The permit for Electrical is still in the applied status. I visited site, but Glenn was not there. I called him on the phone and told him I was sending a refee for the electrical not being taken care of. I gave him 15 day to obtain his electrical permit. |
| 12/11/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Research in Permits Plus show that applications are still in the applied status. There is no progress being made. Apply 1st refee. |
| 11/26/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Spoke with tenant about the need to obtain the sign permit. Granted 15 day extention. He stated that the Architect and Engineer were looking at the wall today or tomarrow. Also the electrical contractor was woking on the plans for the walk-in box. |
| 10/18/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Meet with tenant went over and served NOV. Explained about electric and the need for an architect for the 9' comercial wall. Wiil send NOV also to owner. |
| 10/04/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Visited site and took more pictures of electrical. NEC Violation 110.14, 110.15, 110.22, 110.24(B), 250.148, 210.5(C), 300.6, 300.7, 400.7, 408.41,430.102, |