Case: T13DV06783

Parcel: 12407066A


Addresses:

726 E 9TH ST


Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T13DV06783

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
10/03/2014 INSP - FOLLOW UP CODE ENFORCE Approved Visited site and all items abated. Close Case.
07/24/2014 INSP - FOLLOW UP CODE ENFORCE Approved PERMIT OBTAINED AND INSPECTIONS BEING CALLED IN TO THE BUILDING DPT. WILL CONTINUE TO FOLLOW PERMITS UNIT ALL PERMITS FINAL. FU IN 30
06/24/2014 INSP - FOLLOW UP CODE ENFORCE Approved The purple van is still on the property and hasn't been moved. Will charge the re-fee of $75.00 for the inspection and will check in 45 days. RV.
06/19/2014 INSP - FOLLOW UP CODE ENFORCE Approved Visited site JMV is still present. Send refee.
06/05/2014 INSP - FOLLOW UP CODE ENFORCE Approved Visited site JMV is still present. Send refee.
05/16/2014 INSP - FOLLOW UP CODE ENFORCE Approved Visited site and spoke with Sam Ho. We discussed the condition of the refuse that is starting to return. The Electric is waiting on TEP. The maroon van in the front is now being called a Junked Motor Vehicle. I will revise the NOV.
03/18/2014 INSP - FOLLOW UP CODE ENFORCE Approved Visited site and we are at a standstill with no progress. I will attempt to contact the electricians and the manager.
02/03/2014 INSP - FOLLOW UP CODE ENFORCE Approved Visited site. the painting appears to be done. The trash and debris is starting to pile up again. I will call Sam Ho to discuss. Also a maroon van may be a JMV. I will follow-up. Electric permit has been obtained. Meet with the electrician and they are waiting fro TEP approval of design.
12/16/2013 INSP - FOLLOW UP CODE ENFORCE Approved Visited site. No one was there, so I called Sam Ho. He said that he would have the trash and debris out by the end of the week. He is still working on the painting. He will have the electrician call me.
12/03/2013 INSP - FOLLOW UP CODE ENFORCE Approved Discussed with Sam Ho the time frames that I can work with to help him with finishing the electrical services. At 6 months (1 per month) or 9 months (1 per 1 1/2 months). He is going to speak with his boss tonight and I will check back next week.
11/26/2013 INSP - FOLLOW UP CODE ENFORCE Approved Meet with Sam Ho and discussed the progress he has made. The plumbing has now been abated. He is almost finished with the painting of the exterior surfaces. We discussed what electric need to be taken care of now. Storage appears to be progressing. The travel trailer has been removed.
11/13/2013 INSP - FOLLOW UP CODE ENFORCE Approved Sam Ho was doing work on site. Weeds have been abated. Graffitti has been abated. There has been progress in removal of trash and debris. 15 Days extention. Discussed waht needed to be done with electrical, plumbing, storage and the exterior surfaces. He is working with us to take care of the issues.
09/26/2013 INSP - FOLLOW UP CODE ENFORCE Approved Juan V. and I meet Manager on site Yen Cheng Pan. The owner is Su Chin Pan. Also Tomasz Piotroski of TFD was there to look at the fire extingushers. Explained to the manager what the complaint was and what we were doing on site.
09/18/2013 INSP - FOLLOW UP CODE ENFORCE Approved Richard V. walked site to verify my findings. Took more pictures. Need to contact the Fire department about extingusters.