Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2013 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
07/02/13 - EMERGENCY FIRE CALL (3 ALARM) - FIRE OVER KITCHEN IN RINCON MARKET - DAMAGE TO CEILING ROOF SUPPORTS AND ROOF IN KITCHEN AND SALAD BAR AREA // ELECTRICAL WIRES IN CONDUIT, CANNED LIGHTING AND VOICE DATE VIDEO WIRING ALL RUNNING IN FIRE DAMAGE AREA SHOULD HAVE SUFFERED HEAT DAMAGE // RINCON MARKET HAD TRANSFORMER BOX RUNNING TO MASTER PANEL WITH 3 LINES RUNNING OUT OF THAT // ONE TO ROOF WITH ELECTRICAL PANELS// AND 2 LINES TO PANELS ON GROUND LEVEL IN BACK // GROUND LEVEL HAD OLD COMPRESSORS BLOCKING PANELS // GUTTER BOX OVER STUFFED WITH NO COVER // OLD PANEL BEING USED TO HOUSE SUB PANELS // EXPOSED WIRING // BY BOB DOBBS SUB PANEL LOOSE AND ACTUATORS BROKEN IN PANEL RINCON MARKETS EQUIPTMENT TOO // ALL POWER TO RINCON SHUT DOWN // SW GAS ON SITE AND SHUT GAS TO ENTIRE COMPLEX // BUSINESS TO EAST OF RINCON MARKET RE ESTABLISHED POWER AND BOB DOBBS HAD ELECTRIAN ON SITE TO SECURE TWO FUSE BOXES & ESTABLISHED BONDING BEFORE POWER CAN BE RE ESTABLISHED // AV |