Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | All issues have been addressed. The permit has been finaled. At this time the case will be closed. Violation Abated, Close Case. RV. | |
| 08/28/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the manager and checked the exterior of the structures. Has electrical outlets on the exterior that are not GFCI and some are not live and outlet needs to be removed and place a cover plate if not going to be used. Where some of the penetration on the walls where the conduits have been installed are not sealed. Has some broken window panes and they are already working on the repairs. Will check in 30 days. RV. | |
| 06/23/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the manager and work is still being done on the property. The roofs are being painted with white coating, painting of the exterior to of the 2-story section on the south side. All the electrical has been turned on to all the sub-panels. The gas has been turned back on to all the meters (3). Will check in 45 days. RV. | |
| 05/06/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the workers and checked the status of the work being done. Still has no railing on the 2nd floor. The units on the west side are still not completed. The doors and windows have been installed on the south side on the 2nd floor. Nothing has been done to have an inspection. Will check in 45 days. RV. | |
| 03/31/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Checked the progress of the work being done on the property. The railing has not been installed but has been ordered and not sure when it's going to be installed. Nothing has been done on the end unit that was not inspected with the other rooms. The other side of the complex are being worked and not completed. Still are lacking the painting and the walls and ceilings are being patched. The flooring are being installed with V.C.T. and are lacking the carpet. At this time there are no rooms are ready for inspection. The electrical is being installed on the west side and currently doing the main runs. All the panels have been removed and will be installing the panels soon. The gas line will be changed to new where the leak is located and hopes to have the gas back on in a few weeks. The tile has been installed on the roof of the porches on the west side and the other part on the upper section will be painted. The building has been painted in the middle area of the hotel. Did meet with the contractor to check on the status of the items to be installed and a completion date. | |
| 03/31/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Some work has been done on the electrical to the west side of the building. All the sub-panels have been removed and ready for the new install when they come in due to back ordered. The panel for the west side has been installed and no wiring has been pulled until ready to connect. The gas line has not been repaired to the other parts of the building. No railing has been installed or the stairway to the back building. Work is bing done to the west side rooms and are not painted and some of the VCT is being installed. The back side rooms of the 2-story structure has the doors and the windows installed and are lacking the heating and cooling units. The roof tile has been installed on the porches and the other roofing will be painted soon. The exterior of the building has been painted in the parking lot area. No rooms are ready for inspection at this time. The owner and the contractor are hoping to have the rooms ready in a few weeks. Will check in 30 days. RV. | |
| 02/12/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | The steps to upper decks have been blocked and the area cleaned up where the units are going to be used. No other work has been done since the last inspection on 2-6-14. They are in the process of cleaning the manager office and doing some installation of cabinets. They hope by Monday that the managers office can be inspected to be used to stay in the unit. Will check in 30 days. RV. | |
| 02/06/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owner and the contractor and the correction that were needed to be done have been corrected. Managers unit has not been touched and will not be used. Units that have been cleared are 1 thru 4. They will be calling to have the manager unit checked. Laurie will be checking on the units being cleared for being used. Will keep the same follow up date on 2-13-14. RV. | |
| 02/05/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owner and the contractor to check on the progrss of the work being done on the property. The owner is trying to have 4-units approved to have open for renting out the units. Did an inspection and found some items that need to be addressed and the contractor will make the correction and will check tomorrow at 11:00 for a final. Did find drain line for water missing at the T.P.R., some windows are lacking the locking devies, some of the cranks are not working or missing on casement windows, smoke detectors are to high, ground outlets are on a 2-wire system, extension cord to exhaust hood, missing unit numbers and the units need to be cleaned. Will check tomorrow at 11:00. RV. | |
| 01/28/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the contractor on site to check the progress on the property. The permit is still not issued and waiting for an engineer stamp on the structural for the masonry that has been added and going to be added. Did look at the other work that is being done to the other units. Did look at the water heaters and they are still not to code needing drain lines for the T.P.R. valve and the gas sediment traps. Some of the enclosures need to be repaired to be approved. The gas has been turned on on parts of the structures. The 2-story building near the street is trying to be prepped to open to start renting the units. The rear building and the one on the west side are still being worked on. Did go over that the permit needs to be approved to show what has been changed on the portion that wants to be opened to start renting. Will need to be approved from the inspection before any units can be checked to be occupied for renting. Will keep the same follow up date on 2-13-14. RV. | |
| 01/13/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Talk to the contractor and the permit is still not issued due to needing a structural stamp and still working on what needs to be permitted. There has been no work done since the stopage of the work. They have some cleaning the property and still trying to get the gas approved on the west side. Will check in 30 days. RV. | |
| 12/02/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Did talk to the supervisor of the project and the plans are still being worked on and will require stamps from an engineer and architect before approved. The drawings are including all the changes made on the site. They are hoping in the next couple weeks that the permit will be issued or added the existing permit. Will check in 30 days. RV. | |
| 11/05/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with Ron Brown at P.D.S.D and went over the work that is being done at the current inspection. What is being required that all correction or changes that are being done on the structures are to be shown on the drawings and should be looked or approved with a permit. I have called the contractor to stop all work at this time until the permit has been issued. The contractor has been told that if they have any other changes that they should be shown on the drawings. The contractor will be letting the owner know. The electrical has been connected to the structure. The site was also check today and no one working on the site. The block has been stocked for the other openings to be covered with the masonry at doorways and AC openings. The walkways have been blocked off with temporary hand rails. All the units are still vacant and secured. The contractor will be calling in a few days after he meets with the Architect. We should have a floor plan of all the rooms now and the changes made. Will be check at the end of November. Will check in 20 days. RV. |
|
| 10/30/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owner and T.E.P. on site installing the transformers. 2-New steel poles have been installed for the feed for power to the property and the transformers. The conduit and the sub-panel have been installed for the rooms through out. The power should be installed by next week and will be checking the electrical through out the interior of the units. The gas has passed the pressure test for the gas line and will be checking if the gas can be turned on for only the east side of the structures. Will start working on the water heaters and getting new enclosures. All the doors have been changed through out the units. The rear doors have all been removed and being filled with masonry through out the ground level areas. The sliding glass doors have been removed and being filled for a 3' door and windows with an AC mounted in the masonry. Some of the units have been painted near the manager office area. Floor covering has been removed through out the units. Will check on the permit issues with the commercial reviewers at P.D.S.D. to check if other permit are going to be required. RV. | |
| 09/26/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the contractor and the owners son on the site. Did check the progress of the work being done. The main electrical in the exterior of the building has been installed and inspected and waiting for temp. power to the site. Did ask if the application has been done to have the switch over and the new work done for the power to be hooked up and they stated that it was not needed. The gas line is being tested and holding the pressure test at this time but no permit has been issued for the inspection. Some of the water heaters have been removed to do some to the new work for the electrical. The conduit for the other services panel has been removed to be replaced with new. Did check some of the interior work and the contractor had question on the electrical on being covered and stated that it needs to be inspected before covered. The red line drawings have not been approved and will be taking those drawings on Monday to have checked. The other units are being worked on and that work will not need permits due to only changing the outlets from grounded outlet to duplex outlets and changing light switches. Did go over that the address for the permit needs to be changed to the correct address due to has the address for next door on the current permit. Will check in 30 days. RV. | |
| 08/26/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the contractor and work is being done on the managers unit on the electrical, mechanical and the framing. Some walls have been re-done with 2 x 4. New wiring is being added to have grounded outlets. Did check other units and some work is being done on the repairs on the same side on the managers unit. The plan is to have that side completed to open for business. The electrical boxes are on site for the upgrade but are lacking 2-other boxes for the exterior. Did check some of the other units on the repairs that are being required. Did let the contractor know that the permit has not been issued and will need the permit issued before the changes are done. I did check Permit Plus and the permit is still in applied status. Will check in 30 days. RV. | |
| 08/26/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Permit has been issued, T13CM04642 on 8-26-13 on electrical only on address of 505 W. Miracle Mile. | |
| 07/24/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owners and the N.O.V.'s were served. Did go over what needed to be done and what is going to be required to have the motel re-opened. The contractor showed to the site and went over some concerns on what could remain or what had to be removed. Talk about the stairs, decks the exterior lighting, the water heaters, the gas line if it had to be replaced or can it be repaired. | |
| 06/26/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owners and checked the units not inspected. The owner opened the units that needed to be inspected. Asked the owner if they had question of the inspection and they said no. The owners are still getting bids to have the work done. Will be doing the N.O.V.'s and will be meeting with the owners when completed. RV. | |
| 06/25/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Did inspection on the roof and the interior of the units. Met with the owner and the units were opened by the owner of the property. Will come back tomorrow to finish the interior of the units. RV. | |
| 06/24/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with another contractor at the site to go over the fire damage and an engineer was called to the site to go over the requirements on the repair. Did look at the exterior of the electrical issues and what has to be included on the drawings for approval to have the power turned back on. There will be other issues that will need to be addressed once the power is turned back on and will be part of the same permits. Assisted on the inspection was Martin Lopez and Rick Hollander. Will be checking the other units on Tues. and Wed. for min. housing conditions. RV. | |
| 06/20/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the contractor and Rick Hollander to look at the damage and what needed to be done. The contractor and the owner did meet to talk about money and payments to have the work done. Laurie Pumphrey the area inspector was taken around the the area to look at issues and to meet with the owners of the property. Will meet on Tuesday to go through the rooms to check on issues that need to be addressed. RV. |