Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/15/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
All the work has been done from the fire and the permit has been finaled on 4-24-14. No one home and the owner didn't answer. The property is cleaned. At this time the case will be closed. Violation Abated, Close Case. RV. |
| 03/28/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The drywall is being taped. The last inspection was done on 3-26-14 and lacking the finals only. The property has been cleaned. Will check in 45 days. RV. |
| 01/22/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The masonary to the house has been completed, the framing on the carport and the storage room has been completed and not able to gain entry into the house area to check the framing. The temporary fencing from the fire is being removed due to the carport completed. The lock to the rear gate has been removed. The last inspection was done on 1-17-14 and expires on 7-16-14. The property still has not been cleaned and will charge the re-fee of $75.00 for the inspection. Will check in 45 days. RV. |
| 11/13/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
House is vacant and secured. No work has been done since the last inspection. The plans are in for approval and waiting for the residential to be approved. No work can be done until the block removal has been approved. The inspection follow up was for 11-18-13 but was done today to check on the fencing. Will check in 45 days. RV. |
| 09/17/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The house is vacant and secured. The demo has been completed. Did call the contractor and they are waiting for the drawings from the engineer to submit for approvals for the permit to be issued. No work has been done on the correction due to waiting to check if the demo has been approved. The contractor has been calling for the drawings to check if they are completed and hopes to have the plans soon. Will check in 60 days. RV. |
| 07/16/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
House is vacant and secured. Nothing has been done on the repairs of the fire. Will check in 60 days. RV. |