Case: T13DV03514

Parcel: 11904442A


Addresses:

3508 S 8TH AV


Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T13DV03514

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
06/12/2014 INSP - FOLLOW UP CODE ENFORCE Approved THERE IS NO ACTIVE ONSITE, THE PROPERTY IS SECURED.
PER SUPERVISOR ROMERO CLOSE CASE
01/14/2014 INSP - FOLLOW UP CODE ENFORCE Approved DO NOT PERFORM INSPECTIONS AT THIS SITE UNTIL PROPER PERMIT IS OBTAINED PER DSD
01/13/2014 INSP - FOLLOW UP CODE ENFORCE Approved PARK IS SECURED, MET HIM CONTRACTOR ON SITE. SEE PERSON NOTES.
10/14/2013 INSP - FOLLOW UP CODE ENFORCE Approved ONSITE INSPECTION: ALL GATES ARE SHUT AND LOCKED. THE MAIN DISCONNECTS ARE LOCK BY PADLOCKS. I WALKED THE PARK AND FOUND NO ONE LIVING IN THE CONDEMNED UNITS. I DID SEE A DEAD TREE WAS CUT DOWN. I MET WITH THE MANAGER AND MAINTENANCE MAN WHO NOW ARE LIVING ACROSS THE STREET, THEY STATED THAT THEY ARE MONITORING THE PARK AND ARE MAKING SURE THE PARK STAYS VACANT AND SECURE. WILL FOLLOW UP IN 30 DAYS
09/03/2013 INSP - FOLLOW UP CODE ENFORCE Approved ON SITE TO CONDEMN ALL THE DWELLINGS AND ACCESSORY STRUCTURES. ALL BUILDINGS WERE POSTED WITH THE UNFIT TO OCCUPY PLACARD. SUPERVISOR LEFT THE POWER TO BE SHUT OFF AND USED BY THE ELECTRICAL CONTRACTOR.
08/19/2013 INSP - FOLLOW UP CODE ENFORCE Approved T13CM05038 GENERAL ELECTRIC REPAIR - T13DV03514 General Repair permit 3 hours, if additional time required, inspector to notify owner, permit released to Licensed Contractor for repair due to Violation issued to owner per DNR. SAME PERMIT FOR ALL UNITS
PERMIT EXPIRES ON 02/11/2014
08/13/2013 INSP - FOLLOW UP CODE ENFORCE Approved POSTED THE COMDEMNATION NOTICE'S TO ALL THE UNITS ON SITE. THE NOTICE TAKES EFFECT ON SEPT 2, 2013. SUPERVISOR AND INSPECTOR DEAR ON SITE. THE PROPERTY OWNER WAS ALSO ON SITE WITH THE REPS FROM THE PRIMAVERA FOUNDATION.
08/09/2013 INSP - FOLLOW UP CODE ENFORCE Approved T13SA00227 IS FOR NON CONFORMING STATUS
08/08/2013 INSP - FOLLOW UP CODE ENFORCE Approved ON SITE MEETING WITH OWNER AND CONTRACTOR SEE CONTACTED IN PERSON NOTES IN CONDITIONS
08/06/2013 INSP - FOLLOW UP CODE ENFORCE Approved 8-06-2013
FOLLOW UP INSPECTION; THERE IS CURRENTLY NO PERMITS OR ANY NOTICE GIVEN TO THIS OFFICE AS TO A PLAN WITH TIME LINES OR ESTIMATES, REPORTS ON THE REQUIRED WORK.

TODAY I WALKED THE GROUNDS WITH INSPECTOR DEAR. WE MET WITH THE ON SITE MANAGER. UNIT 31'S WOOD POST WHICH SUPPORTED THE DISCONNECT WAS KNOCK OVER FROM THE STORM DAMAGE, THE POST WAS IMBEDDED IN A DETERIORATED CONCRETE BASE AND FINALLY BROKE OFF.

THE MANAGEMENT INSTALLED ANOTHER DISCONNECT WHICH IS BEING FEED BY WAY OF UNDER GROUND. THE ORIGINAL FEEDERS WERE OVER HEAD. THIS SYSTEM WAS INSTALLED WITHOUT A PERMIT AND NOT TO CODE. THE JUNCTION BOX'S COVER PLATE IS NOT RATED FOR OUTDOOR USE. THE LIFE LINE IS NON METALLIC SHEATHED CABLE IN LIQUID TIGHT CONDUIT. THE CONNECTOR HAS THE WRONG TYPE FITTING AND THE CONDUIT IS NOT PROPERLY INSTALLED WITH EXPOSED CONDUCTORS AT THE CONNECT AND EXPOSED NON METALLIC SHEATHED CABLE WHICH RUNS UNDERNEATH THE TRAILER.

THE CODE VIOLATIONS HAVE NOT BEEN CORRECTED FOR THE 400 AMP MASTER METERED SYSTEM WITH TWO 200 AMP PANELS.
I CONTINUED TO WALK THE PARK AND SAW THAT THE OTHER CODE VIOLATIONS HAVE NOT BEEN ADDRESS.

WE DISCUSS WITH THE MANAGER ALL THE UNITS IN THE PARK AS TO THE OCCUPANCY STATUS
UNITS 1,2,4,5,6,7,8,9,14,15,16,17,18,20,22,23,24,25,26,27,29,31,32,33,34 ARE CURRENTLY 25 ARE OCCUPIED.
THE UNITS OR DESCRIPT BELOW ARE NOT OCCUPIED
UNIT A, IS THE OLD OFFICE WITH A LAUNDRY ROOM ABUTTING.
UNIT'S 10,11,12,B,19,21,28,30 AND THE WORKSHOP WHICH WAS A HOUSE AT ONE TIME AND A SMALL WOOD FRAME STRUCTURE WHICH WAS THE ORIGINAL PARK OFFICE.

MY RECOMMENDATION IS TO HAVE TUCSON ELECTRIC POWER COMPANY CUT THE POWER FROM THE POLE AND START THE CONDEMNATION PROCESS. WE CAN ALSO HAVE SOUTHWEST GAS LOCK THE MASTER METER. THE UNPERMITTED AND UNAPPROVED ELECTRICAL PRACTICES CONTINUE.
05/30/2013 INSP - FOLLOW UP CODE ENFORCE Approved Met on site with the owner along with Carlos, Robert, Rick H. and Rick S. Explained to owner the electrical violations and the need to address them timely. Explained that he needs to hire a licensed electrical contractor, cannot be done by a maintenance person. Also will need permits for the work. Explained that if it is not addressed timely, we may consider having the park vacated. Also went over the need for zoning approval - looks as though the number of units may have expanded over the years without first obtaining a site plan approval. Explained that an NOV would be forthcoming but he needs to get an electrican on hand asap as that is our main concern. He asked how much time he would have to correct the issues. I told him that we will first give him 30 days and in that time, he needs to come back with a plan on how he will address these violations, a contractor on board and a time frame as to when the items will be addressed. If the plan looks reasonable, then we will work with him.