Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/10/2015 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Close per Rick Saldate. The permit has been issued. Violation Abated, Close Case. RV. |
| 06/10/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The owner still working on the drawing for correction that are being required by the inspector to have approvals done. Will check in 60 days. RV. |
| 04/29/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Talk to the owner and the correction have been done and did not call for the inspection to have the final done. The permit expired on 4-19-14 and the owner will check on getting the extension be done to have the inspection done. Will check in 30 days. RV. |
| 02/10/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit is still current and expires on 4-13-14 and needs correction for the final to be done. Will check in 60 days. RV. |
| 11/04/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit has been issued, T13DV06293 on 10-15-13 and had an inspection with needing correction for approval. Will check in 90 days. RV. |