Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE ON 09/01/2015 AND FOUND THAT BALCONIEW AND WALKWAYS FIR BUIDINGS O&P WERE COMPLETED UNDER PERMIT TI4CMO4144. COMPLIANCE / CLOSE CASE. | |
| 04/24/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, FOUND NEW SHORING JACKS SUPPORTING ALL CROSS BEAMS BETWEEN BUILDINGS AND ALL LATERAL BEAMS WHICH ACTUALLY SUPPORT THE WALKWAYS. SHORING JACKS WERE ADDED ON BOTH THE FIRST AND SECOND FLOORS AND BOTH O & P BUILDINGS. HALF INCH STEEL WAS BEING SECURED TO THE LATERAL BEAMS, WORKED WAS NOT COMPLETED. CHECKED P+ AND FOUND NO REVISIONS AT THIS TIME. ** CALLED AND SPOKE TO FRANK MENDEZ, PROJECT SUPERVISOR, FRANK MENTIONED THAT REVISIONS ARE BEING MADE FOR THE ADDITIONAL WORK AND BELEIVES THEY HAVE BEEN SUBMITTED TO THE HOA. ONCE THEY ARE APPROVED, REVISIONS WILL BE SUBMITTED TO DSD. WORK WAS UNDERWAY TO ADD THE 1/2" L METAL UNER EACH BEAM WHEN WORKS FOUND DETERIORATION TO THE CROSS BEAMS BEYOND WHAT THEY EXPECTED. THEREFORE CROSS BEAMS WERE NOT SUFFICIENT TO CARRY THE LOAD OF THE LATERAL BEAMS. INFORMATION WAS GIVEN TO THE ARCHITECTS ALONG WITH REQUIREMENTS FOR ATTACHMENT POINTS OF THE LATERAL BEAM TO CROSS BEAM. WILL CONTINUE TO FOLLOW UP WITH FRANK MENDEZ (780-7811) FMENDEZ@BARKERMORRISSEY |