Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T13DV00037
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/16/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | Case refer to T14DV06688 for new NOV | |
05/16/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, FOUND NO CHANGES. STRUCTURE REMAINS PROPERLY SECURED BY FENCING, LOCKS AND CHAINS FRONT AND REAR. FRONT WALL OF THE BUILDING HAS BEEN SHORED AND SHORING REMAINS IN PLACE ABATING ALL IMMINANT HAZARDS. ** SPOKE WITH MARTIN ROMERO TO DETERMINE HOW TO MOVE FORWARD. MARTIN ASKED THAT WE GIVE THE OWNER A 90 DAY F/U INSPECTION TO ALLOW FOR OWNERS AND INSURANCE TO COME TO SOME TYPE OF AGREEMENT SO THAT THE DRAWING, PERMITS, PORTION TO BEGIN WITH THE UNDERSTANDING THAT THE BUILDING ARE HISTORIC WIHICH MAY ADD TO TIME FRAMES BEING A LITTLE LONGER. F/U INSPECTION SET FOR 8/16/2013 |
|
03/26/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE, FOUND REMOVAL OF THE ROOF COMPLETED AND DEBRIS REMOVED FROM THE PROPERTY. SHORING HAD BEEN REMOVED FROM THE STREET AREA AND PLACED INSIDE THE STRUCTURE, FENCING REMAINS. PORTION OF FRONT GLASS PANEL HAS BEEN REMOVED AND STRUCTURE IS NOW ACCESSIBLE FROM THE STREET SHOULD FENCING BE REMOVED. CONTACTED ALEX SAMPSON OF CHECKS RESTORATION ASKING FOR AN UPDATE ON PROGRESS. | |
03/06/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | MET WITH SCOTT OF CHECKS RESTORATION, FOUND SHORING COMPLETED AND COMPLETION OF THE DEMO WAS TO START TODAY. OPENED GATES TO THE REAR OF THE BUILDING, WENT OVER PAKING LOT ISSUES WITH SCOTT BECAUSE OF THE QUESTIONS HE HAD ABOUT WHAT HE COULD AND COULD NOT DO. SEE LETTER BETWEEN ALEX AND JENNIFER LYNCH PLACED IN CONDITIONS (EMAIL) CONCERNING NESHAP DATES ON REMOVAL PERMIT. | |
03/01/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | INFORMED BY ALEX YESTERDAY THAT THEY WOULD BEGIN SHORING THE FRONT WALL OF 100 E CONGRESS. INSPECTION DID FIND THAT ENGINEERING CREW DID BEGIN THE SHORING OF THE FRONT WALL, THEY WERE UNSURE IF THEY WOULD FINISH TODAY. | |
02/05/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | NOV'S FOR 98, 100-102, AND 108 E CONGRESS WERE COMPLETED ON 1/18/2013. CONTACTED SEAN KAIDER OF ACCLAIM LOSS CONSULTANTS WHO REPRESENT THE OWNERS, SEAN MENTIONED THEY WOULD CONTACT THE OWNERS AND GET BACK WITH ME WHEN THE OWNERS WERE AVAILABLE ALONG WITH THEIR INTERPRETER. STATED IT COULD BE THE FOLLOWING MONDAY OR TUES. I WAS CONTACTED BY SEAN ON THRUSDAY 1/24/13INFORMED THEY WERE SIGNING PAPERWORK WITH OWNERS AND COULD MEET AT NOON TO SIGN FOR THE NOV'S. MET WITH ALC REPS, SEAN AND DUSTIN, OWNERS AND OWNERS INTERPRETER. COMPLETELY WENT THRU ALL THREE NOV'S ANSWERED ALL QUESTIONS FROM EACH PARTY FOR ALL ISSUES. NOV'S WERE SIGNED FOR BY THE OWNER FOR EACH BUILDING SECTION. A 60 DAY FOLLOW UP INSPECTION WILL BE CONDUCTED. |
|
01/02/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | MET WITH RICHARD VIDAL , TFD, TPD, CITY DEMO, AND LATER JIM GARRISON FROM PINA COUNTY/ PARKING OPERATION DUE TO THE STAGING AREA BEING SET UP ON PIMA COUNTY PARKING LOT. HCD INSPECTORS WERE ASKED TO DETERMINE WHAT POWER LINES/CONDUIT, WATER AND GAS LINES NEEDED TO BE CUT, WHERE THE EXTERIOR SOUTH WALL NEEDED TO BE CUT SO THAT EAST AND WEST PARAPHET WALL WOULD NOT BE DAMAGED, AND WHERE AND HOW TO PROCEDE WITH DEMOLITION AND TO STOP DEMOLITION IF THE PROCESS MIGHT CAUSE ANY UNNEACESSARY DESTRUCTION TO ADJOINING BUILDINGS. SOMETIME CLOSER TO NOON HCD INSPECTORS WERE NOTIFIED BY PIMA COUNTY ENVIRONMENTAL ANALYST JENNIFER LYNCH THE PROJECT NEEDED TO BE INSPECTED FOR POSSIBLE ASBESTOS IN THE MATERIALS AND MENTIONED THAT SAMPLES WOULD BE TAKEN AND SENT TO A LAB TO DETERMINE OF ASBESTOS WAS ACTIVE IN THE MATERIALS, AND RESULTS WOULD BE SENT BACK QUICKLY, CITY DEMO DUPLICATED THE MATERIALS FOR THEIR OWN TESTS TO BE CONDUCTED. JENNIFER GAVE THE OK FOR WORK TO MOVE FORWARD. CITY DEMO DID NOT COMPLETE THE DEMO CLEAN UP THAT DAY. BATHCREST WAS CALLED TO SECURE ADDTIONAL OPENINGS NOW EXPOSED, BIFF BAKER WAS CONTACTED TO SECURE THE NEW OPENING CUT INTO THE STRUCTURE AND TO FENCE THE LOT/ STAGING AREA. JIM GARRISON WAS CONTACTED CONCERNING THE USE OF THE LOT. |