Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2014 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/27/2013 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 11/27/2013 | ELECTRIC - FINAL | Denied | - CONDUCTORS #4 & LARGER REQUIRES BUSHINGS AT TERMINATION 300.4 NEC - OVER 250 VOLTS REQUIRES BOND BUSHINGS AT CONCENTRICS 250 NEC - DISC SWITCHES AT MOTORS REQUIRES 36" IN FRONT BY 30" HORIZONTAL WORKING CLEARANCE PER 110.26 NEC - SUPPORT 1 1/2" CONDUITS IN EQUIP ROOM |