Permit: T13CM06448

Parcel: 12108027A


Addresses:

6125 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
11/24/2014 BUILDING - FINAL Approved PER SIGNED JOB CARD
10/17/2014 BUILDING - FINAL Partial Approval IVRS - Inspection :*
10/17/2014 BUILDING - FINAL Partial Approval PROVIDE A LETTER FROM ENGINER TO USE BRASS BACK FLOW PIPE OVERFLOW FROM SOFTNER. PROVIDE COPPER DRAINER PROVIDE THE GASKET AT EXAUST FAN PROVIDE STERLIZATION REPORT PROVIDE GREAS RECEPTOR AT HOOD PROVIDE HEAT SENSOR TEST
10/16/2014 BUILDING - FINAL Partial Approval IVRS - Inspection :*
10/16/2014 BUILDING - FINAL Partial Approval FINISH WORK FROM PREVIOUS REPORT: EF-2 HAS ELEC ISSUES NEED CAPTURE & CONTAINMENT, HEAT SENSOR TEST REPORTS
10/13/2014 BUILDING - FINAL Partial Approval IVRS - Inspection :*
10/13/2014 BUILDING - FINAL Partial Approval PROVIDE AIR BALANCE REPORT CAPTURE AND CONTAINMENT TEST, HEAT SENSOR TEST STERILIZATION REPORT BACKFLOW CERTS.
PROVIDE AN INSULATION SHIELD AT WTR HTR VENT. PROVIDE LISTED GASKET AT EXHAUST FAN. PROVIDE A ROOF JACK AT ELEC TO CONDENSOR. PROVIDE A PROTECTIVE COATING ON EXPOSED ARMAFLEX. PROVIDE DRAFT HOODS FOR HEATERS. PROVIDE TEST FOR CO2 SENSORS